Skip to main content
Find · Dates confirmed within 30 days Board facts as of Oct 25, 2026. Live prices load from the morning pull.

New Apartments Opening Soon in Fort Worth, With Dates We've Confirmed

Fort Worth-side communities that haven't opened yet, with opening dates we confirm at least every 30 days and pre-leasing specials from the morning pull.

  • Free to you, and your rent is the same either way
  • 73 new communities tracked (board, Oct 25, 2026)
  • Prices pulled every morning

Get my shortlist

Tell us your move date and all-in budget. We'll send the whole price for each building that fits.

Step 1 · Your move & budget
Step 2 · How we reach you

Free to you, and your rent is the same either way. We'll text you within minutes during our hours, then send a same-day shortlist.

  • Spirit Real Estate Group, TREC #562021
  • Ground-up new construction only, first move-ins 2024–2027
  • No paid placement. Commission never affects score or sort.
  • Equal Housing Opportunity
New apartment building in final construction with scaffolding and a finished limestone base

What’s on the opening-soon page?

This page lists new Fort Worth-side communities that haven’t opened yet. Each one has an opening date we’ve confirmed in the last 30 days, a pre-leasing special if there is one, and the whole price written out. If you’re planning a move for 2027, this is where to start.

The pipeline is large. About 7,000 units were under construction in Fort Worth–Arlington in Cushman & Wakefield’s Q2 2026 report. You may see 30,246 quoted too, but that figure is DFW-wide, so we don’t use it for this side of the metro.

How does pre-leasing work?

Pre-leasing means signing for a unit before the building, or your part of it, has opened. Communities often take a holding deposit, set a lease start date, and offer a pre-lease special. A building can’t open until it has a Certificate of Occupancy, sometimes a temporary one first, so the start date depends on inspections.

Jefferson Ashford in Grand Prairie is one example on our board: 268 two-story townhomes in pre-leasing, in Tarrant County, Arlington ISD, and Grand Prairie city. Its parcel details are still being confirmed.

Should you pre-lease or move now?

It comes down to your lease end and how much buffer you can keep. Pre-leasing can mean first pick of floor plans and sometimes a deeper special. Moving into an open lease-up means you can see the actual unit and know the date. Our guide on pre-leasing vs. moving now walks through the tradeoff with the questions we’d ask.

What if the date slips?

Dates slip, so we plan for it. Before you sign, we get the delivery date and the delay clause in writing. Many leases let you push the start date, move to another unit, or be released if the unit isn’t ready. We also look at your current lease’s notice window, month-to-month cost, and interim housing in case you need a bridge. Our guide on pre-leasing delays covers each option.

What about buildings that open in phases?

Many new communities open in phases. Phase I may have keys while Phase II is still framing, and some amenities open with a later phase. We ask for the phase map, the work hours, and the amenity opening dates. Our guide on renting in a building that opens in phases explains what to expect.

What happens next?

Tell us your lease end and the areas you’re open to. We’ll text you within minutes during our hours, then send a same-day list of opening-soon buildings with confirmed dates, specials, and year two for each.

The construction pipeline, dated

Market context for how many new units are on the way. Building opening dates come from our calendar, confirmed at least every 30 days.

MeasureValueSource
Under construction, Fort Worth–ArlingtonAbout 7,000 unitsCushman & Wakefield Q2 2026
Under construction, DFW-wide30,246 unitsCushman & Wakefield Q2 2026
Delivered in Fort Worth–Arlington, first half of 20263,208 unitsCushman & Wakefield Q2 2026
Opening date checkAt least every 30 daysOur calendar

Note: the 30,246 figure is DFW-wide. Fort Worth–Arlington is about 7,000.

Buildings we've profiled

Durable facts for each building, with price cells that fill from the morning feed. Ask us for the full current list and we'll text it the same day.

BuildingAreaTrue monthlySpecialCity limits · CountyISDElectricNotes
Jefferson AshfordPre-leasingGrand PrairieWe're confirming this price.We're confirming this price.Grand Prairie city · TarrantArlington ISDOncor (you pick a plan)268 two-story townhomes; parcel being confirmed

Building facts as of Oct 25, 2026. Prices and specials come from the morning feed only; a blank feed value shows "We're confirming this price." Utility lines: we'll help you set it up before move-in.

Why pre-leasing plans slip

The opening date moves

A building can't open until it has a Certificate of Occupancy, and that date can slip by weeks.

Your current lease ends first

Without a buffer, a late opening can leave you paying month-to-month or looking for interim housing.

Amenities open later than units

Phase I can open while the pool, gym, or Phase II are still being built.

So we confirm dates every 30 days, get the delivery date and delay terms in writing, and keep a buffer with your lease end.

What we do, step by step

  1. 01

    Line up the dates

    We start from your lease end and work back to the buildings that open in time.

  2. 02

    Confirm in writing

    We get the opening date, the delay clause, and the pre-lease special in writing.

  3. 03

    Tour what exists

    A model, a hard-hat tour, or a video walk, plus the phase map.

  4. 04

    Watch for changes

    With your consent, at most one alert a day if a date or special moves.

Free. Your rent is the same either way.

What pre-leasing buildings look like

Photos show the kind of building on this page. Ask us for a video walk of the actual unit you'd sign for, not the model.

Opening Soon: questions we get

How do you know when a new building will open?

We confirm opening dates with each community at least every 30 days and show the date we last checked. If a date moves, saved buildings get an alert with your consent.

Should I pre-lease or move into an open building?

It depends on your lease end and how much buffer you have. Our pre-lease or move-now guide compares the delay risk with the specials on each side.

What happens if my move-in date slips?

Check the delay clause in your lease. Options can include a later start date, a transfer to another unit, or a release. We get those terms in writing before you sign.

Can I tour a building that isn't open yet?

Often you can see a model unit or take a hard-hat tour. We'll ask what's available and can send a video walk.

Are pre-leasing specials deeper?

Sometimes. We compare them with lease-up specials on the live board, and we always show year two beside each one.

How many apartments are being built near Fort Worth?

About 7,000 units were under construction in Fort Worth–Arlington in Cushman & Wakefield's Q2 2026 report. The 30,246 figure is DFW-wide.

Do you guarantee the price or my approval?

No. The community sets both pricing and approval, and we confirm them in writing before you sign.

Free to you · Your rent is the same either way

Get the whole price before you tour

Tell us your move date, budget, and where you need to be. We'll make the calls, collect the fee sheets, and do the math for every building that fits.

What happens next: We'll text you within minutes during our hours, then send a same-day shortlist.

We don't guarantee pricing or approval. The community sets both, and we confirm them before you sign.